After getting a better feel for the design, I needed to make sure we were still in budget for the contractor work.  Originally the structure was going to be a small structure in the tree, with a roof deck, but after talking with the city, they let us know that the structure needed to be a minimum of 725 sqft.  This shifted things around a bit.  A few posts ago, you saw the updated design which shows a structure connected by a staircase to the main structure.  This "extra" structure, adds an extra 280 sqft that we had not accounted for....

I met with the contractor to get a feel for what sort of price range we were looking at and unfortunately it was a bit more than we were hoping for...

Back to the budget to see where we can move things around...  after moving our expectations, we are paying more than we thought we would on construction, but still in the budget (I doubt we'll be "in" the budget much longer....hehe)