Shea checks out the tree's, while dad does some off-roading |
1. Go the Major Variance Route (Pricey and still a big chance it wouldn't go through)
2. Go Directly for the Buiding Permit with 2 buidings on the property
I called the city contact and did a pre-chat and told him we were thinking of possibly seperating the minimum square footage in 2 different structures. (One above the garage and the other being the treehouse) I was trying to get a feeler from him, and if this would pose an issue on the project. He let me know that if we proposed that, we would essentially be proposing for a duplex (because there are 2 seperate structures on 1 lot....)
I then asked the golden question: What if we have stairs attatching the 2 structures? It sounds like this idea may be easier to obtain a buidling permit for and so we are on this path.
What that means for the next step: Get with the architect and design a seperate structure close to the main structure and have it connected with stairs. We have been playing with the design and once we get it down I will post it ;)
No comments:
Post a Comment